网站首页 > 血色浪漫 > 当前主题    站内搜索    首页  上一页  下一页  尾页  页次1/1         新用户申请  老用户登录  返回首页
作者信息   主题: 1941年第19装甲师4208

412886049


发表主题: 426
发表回复: 422
网站暂行积分: 1940


【人类幸存者】



  发表时间: 2008-9-26 20:46:49             

特别提示:本帖子在 2008-9-26 20:48:16 由用户 412886049 编辑过

http://www.feldgrau.net/forum/viewtopic.php?f=24&t=17110
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

19 Pz Div – Aug 1941.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

By August 1941, the German offensive had reached a temporary pause with a rather large salient protruding into the German lines on the left of the German Ninth Army. The salient extended west as far as Velikiye Luki which was held by the Russians. Aerial reconnaissance verified a large Soviet buildup with the expected intention of cutting into the rear of the Ninth Army.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

Realizing the Soviet intention, the Germans decided to strike first. Their mission was to reduce the forces in the salient. The operation began on 22 August with an attack by three infantry divisions on the southern . shoulder of the salient to force a penetration. Upon breakthrough two Panzer divisions, the 20th Panzer Division on the left , and the 19th Panzer Division of the right, moved rapidly through the penetration.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

The 19th Panzer was the main effort and had a good road network to support its move, while the 20th guarded its left flank. The objective for the 19th was to cut the soviet lines of communication and link up with XXIII Corps about 40 miles away.21 Because of poor terrain, the 20th would not be able to keep pace with the 19th . In essence the 19th Panzer would be alone for the operation.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

It was obvious to the division commander that, security could only be maintained by speed and constant movement. He organized the division with an advanced guard consisting a panzer regiment an armored artillery unit and a collection of engineer and an antitank detachments. The main body was organized in to two task forces. The first consisted of an armored infantry regiment, two armored artillery battalions, an engineer battalion and various support units. The second was composed of an armored infantry regiment, an artillery battalion, a rocket launcher battalion and various support units. The reconnaissance battalion was task organized with the attachment of the antitank company to provide reconnaissance and security.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com






  玉树凌疯,风流涕淌,装傻充愣,我本纯情
作者信息   主题: 1941年第19装甲师4209

412886049


发表主题: 426
发表回复: 422
网站暂行积分: 1940


【人类幸存者】



  发表时间: 2008-9-26 20:47:26             


19 Pz Div – Aug 1941 (2º part).
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

The reconnaissance task force was positioned forward with the breakthrough divisions so when the penetration was sufficient (about 1200 hours) the 19th Panzer Division was aunched into the Soviet rear. As it did so, it was joined by Luftwaffe aircraft that provided early warning and close air support.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

By 1700 hours 19th Panzer had reached Kunya, thus cutting the rail line to Velikiye Luki. One task force from the main body was ordered to cover the left flank (southwest) of the division as it moved northward from Kunya to Tabory while the reconnaissance battalion guarded the right flank. Moving very quickly the lead elements of the division entered Tabory by 18:00 hours and captured intact the railroad bridge and the road bridge over the Kunya River.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

However, these were not sufficient to support the movement of large vehicles. The bridgehead was expanded west of the river and the division engineers were ordered to build.a bridge for the division's heavy vehicles. This situation forced the halt of the advance for the day and the division went into a hasty defense in anticipation of Soviet counterattacks that night.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

The division commander planned to continue the attack as soon as the bridge was constructed and to link up with XXIII Corps at Velikiye Luki that day, thus completing the encirclement of the Soviet force. The division was not, able to cross until around 15:00 hours making the link up that day impossible. After crossing the bridge, however they encountered some resistance. 'They routed one formation, captured another and destroyed elements of a third, to include some tank and antitank forces.
浪漫烛光 www.langmanzg.com





  玉树凌疯,风流涕淌,装傻充愣,我本纯情
作者信息   主题: 1941年第19装甲师4210

412886049


发表主题: 426
发表回复: 422
网站暂行积分: 1940


【人类幸存者】



  发表时间: 2008-9-26 20:47:40             


19 Pz Div – Aug 1941 (3º part - The End).
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

During the day aerial reconnaissance had spotted a large formation of Soviet troops moving toward the northwest. At about 01:00 hours the Soviets launched a large scale attack against the 19th Panzer. The fighting was fierce and costly to both sides, but in the end the Soviets were repulsed.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

The Germans again moved toward Velikiye Luki the following day. The Soviets continued their effort to break out, thus delaying the link up between 19tn Panzer and XXIII Corps. Finally, early on the 25th of August after three and a half days of fighting the link up was made.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

Following two more days of fighting the salient was reduced. The Germans had destroyed or captured eight divisions ending the threat to Ninth Army.
浪漫烛光 www.langmanzg.com


浪漫烛光 www.langmanzg.com

Source: A LOOK AT DEEP OPERATIONS: THE OPTION OF DEEP MANEUVER BY M a j o r David C. Mock. Armor. School of Advanced Military Studies U.S. Army Command and General Staff College Fort Leavenworth, Kansas 31 December 1987
浪漫烛光 www.langmanzg.com





  玉树凌疯,风流涕淌,装傻充愣,我本纯情
新用户注册   返回首页
首页  上一页  下一页  尾页  页次1/1   转到第